Construction Site Safety Management | A Top-10 Risk Prevention Checklist for PV-Storage-Charging Projects

2026-11-14

An integrated PV-storage-charging project, combining photovoltaic (PV) generation, battery energy storage and EV charging, involves multiple risks at the same time: work at height, lifting and hoisting, AC/DC high voltage, lithium battery fire hazards during hot work, and multi-crew simultaneous operations. Construction at height on rooftops and carports, high-voltage electrical work, and energy storage battery fire prevention form the core of safety control for PV-storage-charging projects. This article presents a top-10 risk prevention checklist for PV-storage-charging construction sites, aiming to standardize special-work approval and hold the safety bottom line for new energy project construction.

I. Proven EPC Qualifications and Capability

For integrated PV-storage-charging projects covering PV, energy storage and AC/DC EV charging, Infraswin Energy holds full-process EPC qualifications:

Electric Power Facility Installation (Repair and Testing) License (Class III): qualifies the company to undertake grid-connection electrical construction up to 35 kV, covering PV grid connection, energy storage PCS, AC/DC charging piles, and the installation and acceptance of HV/LV power distribution.

Construction Labor Services Qualification: in-house construction crews under real-name management eliminate loopholes in subcontractor control.

Work Safety License: a complete safety management system and emergency response framework that meets the statutory requirements for new energy electrical engineering construction.

II. Overview of Construction Risks in PV-Storage-Charging Projects

Scope of work: rooftop/carport PV installation, energy storage equipment positioning, and the electrical construction of AC/DC charging piles.

Core high risks: falls from height, lifting injuries, AC/DC electric shock, lithium battery thermal runaway fire, hot work fire, struck-by objects, charging pile high-voltage arcs, temporary power hazards, and risks from multi-crew simultaneous operations.

III. Top 10 Hazards and On-Site Prevention Checklist

No.Risk CategoryRisk DescriptionKey Control MeasuresPermit Requirements
1Falls from height (PV work)Work on rooftops and carport roofs; unprotected edges and openings, insufficient panel load capacity, and component handling can easily cause falls.Lay walkway boards on working surfaces and fully enclose openings and edges; anchor safety belts high and use them low, never step on fragile panels; stop work at height in heavy wind, rain or snow.Work-at-height permit + roof load-capacity verification record
2Lifting and hoisting injuriesInsecure rigging, slanted lifting or falling objects while hoisting PV modules and electrical equipment may injure people below.Certified crane operators plus dedicated signalmen; strictly enforce the ten no-lift rules; trial lift before hoisting; fully cordon off the lifting zone; suspend lifting in high wind.Lifting plan approval + lifting operation permit
3AC/DC electric shock (station-wide)PV arrays are energized in daylight; storage DC high voltage and charging-pile high-voltage circuits coexist with AC utility power. Without lockout/tagout, accidental contact can easily cause shock.Strictly implement de-energize - verify - discharge - lockout/tagout (LOTO); cover PV modules to stop generation; run AC and DC cables in separate trays with color coding; implement three-level distribution with two-level protection.LOTO lockout records + AC/DC insulation testing
4Thermal runaway fire of storage batteriesBatteries damaged by impact, or hot work near equipment igniting battery packs, can trigger thermal runaway fires.Handle batteries gently; impact and dropping are strictly prohibited; upgrade hot work in storage areas to Class I hot work, remove combustibles and lay fire blankets; reserve fire separation distances between equipment.Class I hot work permit + lithium-battery-specific safety briefing
5Fire from overlapping hot workWelding sparks from bracket work can drift into cable, storage and charging areas and ignite cable insulation.Cover the area below hot work points entirely with fire blankets; set up rigid fire isolation strips between the PV area and the storage/charging areas; keep a fire watch for 30 minutes after hot work ends.Classified hot work approval; dry powder extinguishers fully stocked on site
6Struck-by falling objects in overlapping operationsThrowing tools or fittings from height, or simultaneous work on multiple levels, can injure people below.Keep all tools in tool bags, throwing objects is strictly prohibited; stagger work sequences; cordon off the area below work at height and forbid passage.Safety technical briefing for overlapping operations
7Charging pile electric shock and fireMixed neutral/ground wiring or outdoor water ingress on AC piles; residual capacitor voltage on DC piles producing DC arcs when covers are opened; missing leakage protection.Wire AC piles to code and waterproof the bases, one machine - one switch - one leakage protector; DC maintenance requires de-energizing, standing discharge and re-verification with DC-specific insulated tools; reliable grounding meeting resistance standards.Charging pile electrical testing + grounding resistance testing + DC high-voltage briefing
8Cable laying and temporary power hazardsAC and DC cables mixed in one trench with water-soaked damaged joints; one switch feeding multiple machines; live outdoor wiring in the rain.Lay AC and DC cables in separate channels and waterproof-seal joints; strictly enforce one machine - one switch - one leakage protector - one box; stop outdoor live wiring on rainy days.Concealed cable acceptance + daily temporary power inspection log
9Injuries during equipment positioningSlanted lifting of storage equipment, collisions with enclosures during positioning, or people standing under suspended loads.Select proper lifting points for large equipment and set down gently; cordon off the lifting zone; no one may stand under suspended loads.Lifting operation permit + equipment entry protection briefing
10Poor control of multi-crew simultaneous workPV, storage, charging pile and civil crews working at the same time; mixed work zones and loose personnel control.Grid-based zoning with physical barriers separating the elevated PV area, storage area and charging area; staggered schedules; real-name management of outsourced personnel plus three-level safety training.Subcontractor safety agreements + daily pre-shift meeting records

IV. Five Key Site-Wide Safety Control Measures

(1) Strict special-work permit management

Work at height, lifting operations, Class I hot work and DC high-voltage work must be approved before construction starts; any work without a permit or a supervisor is halted immediately.

(2) Physical zoning and segregation

Following the general site layout, rigid fencing divides the site into five independent zones: work area, material storage area, lifting area, hot work area, and office/living area, with code-compliant fire separation distances, isolation fencing and warning signs between zones.

(3) Dedicated fire control for the energy storage system

Storage equipment keeps fire separation distances; hot work stays away from battery compartments; lithium-battery-specific firefighting equipment is fully provided to prevent thermal runaway accidents.

(4) Full-process control of lifting operations

A dedicated lifting plan is mandatory for hoisting; certified command, trial lifts and cordon/isolation measures are implemented to prevent falling objects.

(5) Classified electrical control of charging piles

AC piles: focus on waterproofing and leakage control. DC piles: strictly follow the capacitor discharge procedure to prevent DC arc injuries.

V. Emergency Response Essentials

Falls and lifting injuries: stop work immediately, rescue the injured without delay, and seal off the accident scene.

Storage battery fire: cut off all AC/DC power station-wide at once, isolate faulty equipment and evacuate personnel first; opening covers to fight a lithium battery fire at close range is strictly prohibited.

Charging pile electrical fire: disconnect the upstream power first, then extinguish with dry powder extinguishers; spraying water on live equipment is strictly prohibited.

VI. Closing Remarks

Backed by a full set of EPC qualifications, Infraswin Energy is deeply engaged in integrated PV-storage-charging engineering construction. PV-storage-charging projects are high-risk new energy electrical works, where lifting at height, AC/DC high voltage and lithium battery fire prevention are the key links of safety management. Only by strictly implementing the top-10 risk checklist - every job approved, every risk controlled, every emergency pre-planned - can projects be built smoothly and delivered with zero accidents.

Shanghai Infraswin Energy Co., Ltd. embeds safety across the whole cycle - scheme design, equipment manufacturing, on-site construction and grid-connection delivery - providing commercial and industrial customers with safe and reliable integrated PV-storage-charging energy solutions.